The project includes approximately 350 lineal meters of 200mm sanitary sewer main installation, approximately 17 vertical meters of 1,200mm manhole installation, approximately 1,710 lineal meters of 250mm and 300mm watermain installation with hydrant leads, 3 hydrant assembly installations, approximately 124 lineal meters of CSP culverts, approximately 75 lineal meters of 375mm storm main, 5,000 cubic meters of topsoil stripping, 15,000 cubic meters of clay earthworks, approximately 9,100 square meters of 200mm depth crushed gravel installation, approximately 16,000 square meters of topsoil placement and seeding.

Opportunity closing date
09 May 2024
Value of contract
to be confirmed

About the buyer

Address
Select Engineering Consultants Ltd. CANADA

The deadline to apply for this opportunity has passed.
Visit the opportunities page to find another.

Is there anything wrong with this page?